1999.11
Awarded the
¡°Prize for export
of five million dollars¡±
1996.04
Acquired BRZ
1991.12
Completed construction of
Onsan refinery private port
 Awarded the ¡°Prize for export of five million dollars¡± by the President of Korea
 Completed the expansion program at the Onsan Refinery with a capacity of 350,000 tonnes per annum
 Incorporated Sun Metals Corp. in Australia
  Acquired Big River Zinc Corporation in Illinois, U.S.A with a capacity of 80,000 tonnes per annum of zinc
  Completed construction of TSL plant for zinc fumer
 Began direct leaching of zinc sulfide concentrate and expanded zinc production to 215,000 tonnes per annum
  Started coal burning power plant at Onsan with a 43MW capacity
  Completed construction of QSL lead smelter and expanded the capacity of Onsan lead refinery to 135,000 tonnes per annum
  1991.12 Completed construction of Onsan refinery private port
  Listed on Korea Stock Exchange